Boat
Class Globe 5.80
FLATPACK
235

Class Globe 5.80 Feed Aggregation

This an aggregated feed of Class Globe 5.80 build blogs which displays the 10 most recent blog posts from CG580 builders across the world.

Not all build blogs can be included - only blogs that have an Atom or RSS feed as these are the only ones that can be imported automatically. I have also de-listed some blogs where the content is not predominently CG580-related.

This list updates automagically every day at about 6am UTC. The last update was on Apr 14 2025 at 06:00:44 UTC.

Tangram ! 七巧板


by Anne et Michel on in tangram BEL-246

tangram bel-246 blog classglobe 5.80 blog tangram cg#246 classglobe 5.80 voilier classglobe  

One small step…., and then another, then another etc!

One small step…., and then another, then another etc! Thumbnail

The thing is with plans, they are just that – plans – until they become reality. When I undertook this adventure I knew things would be difficult …
by Michael Johnson on in Uncategorized

uncategorized adventure boat-building projects sailing  

Pose du bordé

On passe à l'étape suivante, le bordé, il faut déjà jouer du rabot. Ca ne s'est pas trop mal passé, je m'attendais à pire ! Les …
by jojobato on in

Alignement des cadres

Alignement des cadres Thumbnail

Ça prend formeCette étape est vraiment l'fun, plus tu enchaines les cadres, plus sa forme se définie. Voir le squelette du voilier, c'est très …
by Yan Isabelle (noreply@blogger.com) on in

Floor

I still work inside the boat. I have made a small folding seat that covers the bilge pump. The seat also serves as a step …
by Joe Goetz on in Allgemein

allgemein  

 Thumbnail

 Perdon por la tardanza pero ya casi esta todo acabado en lo que se refiere a la maderaProximo paso sera el poliester al casco …
by Manuel Rodriguez (noreply@blogger.com) on in

TIMBER !


by Anne et Michel on in tangram BEL-246

tangram bel-246 blog classglobe 5.80 blog tangram cg#246 voilier classglobe  

Le dos fort (strongback)

Le dos fort (strongback) Thumbnail

 Une base pour commencerCette étape est très importante puisque toute la construction repose sur elle. Le dos fort est la structure qui va permettre …
by Yan Isabelle (noreply@blogger.com) on in

Trêve hivernale et fin de plaquage.

Trêve hivernale et fin de plaquage. Thumbnail

2 mois sans post.  6 semaines de froidures et de thermomètre trop bas pour l’époxy.  Donc 6 semaines de ski de rando et de …
by Laurent Allidieres on in Non classé

non classé  

I am sailing, I am sailing….

I am sailing, I am sailing…. Thumbnail

As you know I have never sailed in my life. Something that a lot of people found amusing when I told them that I was …
by Michael Johnson on in Uncategorized

uncategorized